Michrazonim

More tenders. Right on time. With ease.

Tenders go out according to the project schedule, and every bid, PDF or Excel, is read and matched to the bill of quantities. The decision stays with you.

Michrazonim saves about 3 person-months per project*

TendersElectrical & telecom
Bid comparison

Electrical & telecom tender · Building B · 4 bids

Example
08.04.010

Data point

256 pts
  1. A.B. Electric79,360
  2. Nativ Or76,800
  3. S.M. SystemsNot priced
  4. Y. Cohen84,480
ItemUnitQty A.B. ElectricNativ OrS.M. SystemsY. Cohen
08.01.010Lighting point incl. conduit and wiringpts296 148,000162,800153,920171,680
08.01.02016A socket outlet pointpts412 94,76090,64098,880103,000
08.02.040Apartment distribution boardUnit64 179,200188,160172,800181,760
08.04.010Data pointpts256 79,36076,800Not priced84,480
08.05.030Foundation earthingLS1 38,50041,00036,90035,200
Total 539,820559,400462,500*576,120
Lowest for the item Not priced * The total is low because an item is missing.
~18,000contractors in the pool, from the public contractors’ register
On scheduleEvery tender is ready to go out when the project needs it. You approve and send.
Line by lineEvery bid is laid out on the BOQ items
Every decision on recordWho approved, who changed what, and when

How we calculated. An example of a large project: about 80 subcontractor tenders. An estimate of about 10 hours of manual work per tender: preparing the documents, sending them to subcontractors, following up on submissions, typing the bids into Excel and comparing them. About 800 hours in all. By our assumption, not yet measured with customers, Michrazonim saves about 70% of this work, or about 560 hours. Divided by 165 working hours a month, that comes to about 3.4 person-months, and with a full-time month of 182 hours, about 3.1: about 3 person-months. These figures are an estimate, not a measurement, and they change with the size of the project and the number of tenders. The approval and the decision stay with you.

Why Michrazonim

Tenders still go out late, and are still closed over Excel and WhatsApp.

Every subcontractor sends a different format, someone types it all into Excel by hand, and the next tender waits in line.

01The tender goes out late.

When every tender is prepared by hand, the next one waits, and the work on site waits with it.

02Every subcontractor, a different format.

You can’t compare until everything is retyped into Excel.

03A missing item looks like a discount.

And sometimes you only find out after signing.

How it works

From the schedule to the decision. In five steps.

New tender
Example

Electrical & telecom tender · Building B

  • Bill of quantities Excel
  • Drawings PDF
  • Submission deadline 15/03/27
Features

Everything a tender needs. To go out on time.

AI bid reading.

PDF and Excel bids are read and arranged by the tender’s items. A bid that reached you as a photo, you upload yourselves, and it is read too.

Line-by-line comparison.

Every bid on your bill of quantities, with the lowest price on each item marked.

Subcontractor suggestions.

Michrazonim suggests contractors by trade and region, from a pool of about 18,000 contractors from the public contractors’ register, and you approve.

Missing items flagged.

A bid that leaves out an item doesn’t look cheaper. You see what’s missing.

A personal link for each subcontractor.

Drawings, BOQ, Q&A and the submission deadline. On a phone, too.

Tenders by the schedule.

The list of tenders is built from the project schedule, and each tender is ready to go out when its time comes. You approve and send.

Every bid is read and matched to the bill of quantities. The decision stays with you.

For general contractors, property developers and procurement managers

More tenders, same team. The decision is yours.

  • Tenders go out according to the schedule, to subcontractors you approve, through a personal link.
  • Every bid is laid out line by line. The lowest is marked, and so is anything missing.
  • The winner, the comparison and the reasoning are kept in one place, ready to look back on.
Open a company account
Decision file· Electrical & telecom
Example
  • The 4 bids received
  • The lines the project manager approved
  • The comparison table and the flagged gaps
  • The reasoning behind the choice
WinnerA.B. Electric
For contractors

Submit the way you’re used to. Get a clear answer.

  • PDF or Excel. No forms to fill in again.
  • One link per tender, with all the documents and the submission deadline.
  • When the company decides, you’ll hear whether you won.
Join the pool, get bid requests
Invitation to bidElectrical & telecom tender · Building B
  • Drawings PDF
  • Bill of quantities Excel
  • Q&A
  • Submission deadline
Upload a bidPDF or Excel
Security and privacy

Your prices stay yours.

Only the company that invited them can see them.

A contractor’s prices are shown only to the company that invited them. Other contractors and other companies can’t see them.

Every decision and change is logged.

Who approved, who changed what, and when.

We’re not a party to the deal.

Michrazonim doesn’t choose the winner. You make the decision.

FAQ

Frequently asked questions

In which formats can a subcontractor submit a bid?

PDF or Excel. Michrazonim reads the bid and lays it out on the BOQ items.

Does the system choose the winner?

No. It reads, organizes and flags. The tender manager chooses the winner, in a transparent, documented way.

Who can see a subcontractor’s prices?

A contractor’s prices are shown only to the company that invited them. Other contractors and other companies can’t see them.

Do I need to install anything?

No. Michrazonim works in the browser, and subcontractors can submit from a phone, too.

How do I get started?

Open a company account, upload a bill of quantities and send your first invitation. The Michrazonim team helps you get set up.

How did you arrive at about 3 person-months?

It is an estimate for a large project with about 80 tenders: about 10 hours of manual work per tender, and by our assumption, not yet measured with customers, about 70% of it is saved. About 560 hours in total, that is about 3 person-months (165 to 182 hours a month). This is an estimate, not a measurement, and it changes with the size of the project. The approval and the decision stay with you.

Your next tender goes out on time.

Accessibility statement

We want everyone to be able to use the Michrazonim website, including people with disabilities. The site was built to meet the requirements of Israeli Standard IS 5568, which is based on the WCAG guidelines at level AA, as required by the Equal Rights for Persons with Disabilities (Service Accessibility Adjustments) Regulations, 2013.

What the site offers

The demo video

Everything shown in the video is also described in text on this page, in “How it works”.

Ran into a problem?

Tell us on the contact page. Let us know which part of the page it was and which browser or assistive technology you used, and we’ll get back to you.

Accessibility inquiries: michrazonim.app@gmail.com or through the contact page.

This statement was last updated on November 3, 2026.